Key takeaways
- Pre-construction turns a set of drawings into a scope, a budget and a schedule you can trust.
- Bids from handpicked, well-briefed subcontractors are more accurate than open bids.
- Questions asked of the architect before construction cost far less than changes made during it.
On a complex home, the most important decisions often happen before anyone picks up a tool. Pre-construction is where the builder learns the drawings well enough to price them honestly, schedule them realistically and spot the risks early.
What goes in the binder
At MurphyMcKenna, pre-construction ends with a painstakingly prepared binder. It:
- Specifies the construction details
- Identifies the scope of work
- Includes bids from pre-qualified subcontractors
- Contains thoroughly reviewed subcontractor proposals
- Sets out a preliminary budget and a realistic schedule
- Outlines cost reduction strategies (value engineering)
- Pinpoints risk areas
Why handpicked bids matter
Not every subcontractor is right for every job. A builder who knows the strengths and weaknesses of the trades can invite the right ones, then walk them through what the project needs. Bids from a briefed team are more accurate, and the team is invested before work begins.
Visibility for everyone
Bids, RFIs and estimates live in Procore, so the client, architect and design team can see the project at any time, from anywhere. When everyone works from the same information, fewer things slip through the cracks.
| Question | Answered in pre-construction by |
|---|---|
| What exactly are we building? | Construction details and scope of work |
| What will it cost? | Preliminary budget from reviewed subcontractor bids |
| How long will it take? | A realistic schedule |
| Where can we save? | Value engineering options |
| What could go wrong? | Identified risk areas |