Key takeaways
- Early builder input tests the design for constructability while it is still cheap to change.
- The builder can price options as the design develops, so there are fewer surprises at bid.
- A shared plan from the start builds trust between client, architect and builder.
Architects usually give clients several contractors to choose from. On some projects, it pays to choose the builder much earlier.
What early involvement looks like
- Reviewing drawings for constructability, building systems and value
- Pricing options while the design is still flexible
- Flagging long-lead materials and specialist trades
- Planning site access, sequencing and risk
Protecting the details
Custom homes are remembered for their details: a cantilevered stair, a slat ceiling, a flush finish. When the builder understands the intent behind each detail from the start, it is far more likely to be built the way it was drawn.
| Brought in late | Brought in early |
|---|---|
| Design is priced after it is finished | Options are priced as the design develops |
| Constructability issues appear on site | They are solved on paper |
| Value engineering cuts features | Value engineering protects intent |